{"id":111027,"date":"2025-05-20T16:21:50","date_gmt":"2025-05-20T16:21:50","guid":{"rendered":"https:\/\/bossforward.org\/?p=111027"},"modified":"2025-06-04T16:49:07","modified_gmt":"2025-06-04T16:49:07","slug":"%f0%9f%9a%a7-street-improvement-projects-may-28-30-%f0%9f%9a%a7","status":"publish","type":"post","link":"https:\/\/bossforward.org\/?p=111027","title":{"rendered":"\ud83d\udea7 Street Improvement Projects Happening Now \u2013 May 28\u201330 \ud83d\udea7"},"content":{"rendered":"\n<p>The Borough of Sinking Spring will now be conducting <strong>milling and base repair work<\/strong> on the following streets:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Elizabeth Drive<\/strong> \u2013 <strong>Wednesday, May 28<\/strong><\/li>\n\n\n\n<li><strong>Evans Avenue<\/strong> \u2013 <strong>Thursday, May 29<\/strong><\/li>\n<\/ul>\n\n\n\n<p>Final paving for both streets is scheduled for <strong>Friday, May 30<\/strong>.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"771\" src=\"https:\/\/bossforward.org\/wp-content\/uploads\/2025\/05\/250520-Road-improvement-annoucement-1024x771.png\" alt=\"Road closures on Evans ave and Elizabeth drive from May 28-30\" class=\"wp-image-111028\"\/><figcaption class=\"wp-element-caption\">Affected streets are highlighted red<\/figcaption><\/figure>\n<\/div>\n\n\n<p>\ud83d\udeab <strong>Please note:<\/strong> Parking and traffic will be restricted on these roads during the work. We appreciate your patience and cooperation as these improvements are made.<\/p>\n\n\n\n<p>Thank you for helping us maintain and improve our community!<\/p>\n\n\n\n<ul class=\"wp-block-social-links is-layout-flex wp-block-social-links-is-layout-flex\"><li class=\"wp-social-link wp-social-link-facebook  wp-block-social-link\"><a href=\"https:\/\/www.facebook.com\/sinkingspring\/\" class=\"wp-block-social-link-anchor\"><svg width=\"24\" height=\"24\" viewBox=\"0 0 24 24\" version=\"1.1\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\"><path d=\"M12 2C6.5 2 2 6.5 2 12c0 5 3.7 9.1 8.4 9.9v-7H7.9V12h2.5V9.8c0-2.5 1.5-3.9 3.8-3.9 1.1 0 2.2.2 2.2.2v2.5h-1.3c-1.2 0-1.6.8-1.6 1.6V12h2.8l-.4 2.9h-2.3v7C18.3 21.1 22 17 22 12c0-5.5-4.5-10-10-10z\"><\/path><\/svg><span class=\"wp-block-social-link-label screen-reader-text\">Facebook<\/span><\/a><\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The Borough of Sinking Spring will now be conducting milling and base repair work on the following streets: Final paving for both streets is scheduled for Friday, May 30. \ud83d\udeab Please note: Parking and traffic will be restricted on these roads during the work. We appreciate your patience and cooperation as these improvements are made. [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1510,1],"tags":[1505,1506,1504,1511,1512],"class_list":["post-111027","post","type-post","status-publish","format-standard","hentry","category-borough-events","category-uncategorized","tag-road-closed","tag-road-closure","tag-roads","tag-roadwork","tag-street-improvement-project"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/bossforward.org\/index.php?rest_route=\/wp\/v2\/posts\/111027","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bossforward.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bossforward.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bossforward.org\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/bossforward.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=111027"}],"version-history":[{"count":15,"href":"https:\/\/bossforward.org\/index.php?rest_route=\/wp\/v2\/posts\/111027\/revisions"}],"predecessor-version":[{"id":111150,"href":"https:\/\/bossforward.org\/index.php?rest_route=\/wp\/v2\/posts\/111027\/revisions\/111150"}],"wp:attachment":[{"href":"https:\/\/bossforward.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=111027"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bossforward.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=111027"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bossforward.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=111027"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}